{"id":1771,"date":"2025-12-19T11:28:28","date_gmt":"2025-12-19T17:28:28","guid":{"rendered":"https:\/\/vlkarchitects.com\/?p=1771"},"modified":"2026-01-13T09:24:46","modified_gmt":"2026-01-13T15:24:46","slug":"vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads","status":"publish","type":"post","link":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/","title":{"rendered":"VLK Joins Denton ISD in Topping Out Fifth High School in Cross Roads"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">On Wednesday, December 17, VLK joined Denton ISD for the topping out of the district\u2019s newest high school. Denton ISD students, staff, and community members gathered to sign their names on the final steel beam before hoisting it in place, marking the completion of structural steel on the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The district\u2019s fifth high school is located along the rapidly developing U.S. 380 corridor, the fastest-growing area of Denton ISD. Designed to support this growth, the new high school has a capacity of a 5A or larger designation and prioritizes visibility, supervision, and student safety.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">\u201cWe are especially grateful to Denton ISD, a district we have had the privilege of serving for more than 20 years across numerous bond programs and transformative educational projects,\u201d said Marty Sims, Principal at VLK. \u201cDenton High School #5 is more than a building\u2014it&#8217;s an investment in the future of thousands of students who will learn, collaborate, compete, perform, and discover their passions here.\u201d<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">The main building will be a 484,000 sf, with spaces supporting robust academic, fine arts, and athletics programs that are clearly defined while remaining interconnected. The focal point of the facility is a three-story atrium that serves as the main entry point for the school. A 750-seat proscenium theater, designed to accommodate a professional fly system and stage wings, anchors the fine arts wing while seamlessly integrating into the overall facility. The school also supports athletics and student life through a full athletics complex, including a 2,100-seat competition gymnasium and outdoor competition and practice fields. Together, these features support the district\u2019s projected growth while providing a comprehensive environment for students and staff to thrive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Funded by the 2023 Bond, the new school is a part of Denton ISD\u2019s recent expansion, following the opening of <a href=\"https:\/\/sandbrockes.dentonisd.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sandbrock Ranch Elementary School<\/a> and <a href=\"https:\/\/cheekms.dentonisd.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">Cheek Middle School<\/a>. High School No. 5 is scheduled to open for the 2027-2028 school year.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"698\" data-id=\"1773\" src=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9651-1024x698.jpg\" alt=\"\" class=\"wp-image-1773\" srcset=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9651-1024x698.jpg 1024w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9651-300x205.jpg 300w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9651-768x524.jpg 768w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9651-1536x1047.jpg 1536w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9651-2048x1397.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"1774\" src=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9751-1024x683.jpg\" alt=\"\" class=\"wp-image-1774\" srcset=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9751-1024x683.jpg 1024w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9751-300x200.jpg 300w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9751-768x512.jpg 768w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9751-1536x1024.jpg 1536w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"1775\" src=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9876-1024x683.jpg\" alt=\"\" class=\"wp-image-1775\" srcset=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9876-1024x683.jpg 1024w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9876-300x200.jpg 300w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9876-768x512.jpg 768w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9876-1536x1024.jpg 1536w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On Wednesday, December 17, VLK joined Denton ISD for the topping out of the district\u2019s newest high school. Denton ISD students, staff, and community members gathered to sign their names on the final steel beam before hoisting it in place, marking the completion of structural steel on the project. The district\u2019s fifth high school is [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":1772,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[21],"tags":[77,56],"branded-service-type":[],"construction-type":[88,37],"event-type":[41],"office":[28,27],"practice-area":[33],"class_list":["post-1771","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-high-school","tag-k-12","construction-type-high-school","construction-type-new-construction","event-type-topping-out","office-dallas","office-fort-worth","practice-area-education"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>VLK Tops Out Denton ISD High School in Cross Roads<\/title>\n<meta name=\"description\" content=\"Celebrating a milestone: VLK Architects and Denton ISD top out the new high school in Cross Roads, advancing education and community growth.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"VLK Tops Out Denton ISD High School in Cross Roads\" \/>\n<meta property=\"og:description\" content=\"Celebrating a milestone: VLK Architects and Denton ISD top out the new high school in Cross Roads, advancing education and community growth.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/\" \/>\n<meta property=\"og:site_name\" content=\"VLK\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-19T17:28:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-13T15:24:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9686-e1766164506161-1024x505.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"505\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Navya\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Navya\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/\"},\"author\":{\"name\":\"Navya\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/person\\\/ca4fa8ce56fe338504218e3125d57293\"},\"headline\":\"VLK Joins Denton ISD in Topping Out Fifth High School in Cross Roads\",\"datePublished\":\"2025-12-19T17:28:28+00:00\",\"dateModified\":\"2026-01-13T15:24:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/\"},\"wordCount\":326,\"publisher\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Denton-HS-5-Topping-9686-e1766164506161.jpg\",\"keywords\":[\"High School\",\"K-12\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/\",\"name\":\"VLK Tops Out Denton ISD High School in Cross Roads\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Denton-HS-5-Topping-9686-e1766164506161.jpg\",\"datePublished\":\"2025-12-19T17:28:28+00:00\",\"dateModified\":\"2026-01-13T15:24:46+00:00\",\"description\":\"Celebrating a milestone: VLK Architects and Denton ISD top out the new high school in Cross Roads, advancing education and community growth.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/#primaryimage\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Denton-HS-5-Topping-9686-e1766164506161.jpg\",\"contentUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Denton-HS-5-Topping-9686-e1766164506161.jpg\",\"width\":8256,\"height\":4073},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/vlkarchitects.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"VLK Joins Denton ISD in Topping Out Fifth High School in Cross Roads\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#website\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/\",\"name\":\"VLK\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/vlkarchitects.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#organization\",\"name\":\"VLK\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/VLK-Logo.png\",\"contentUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/VLK-Logo.png\",\"width\":439,\"height\":635,\"caption\":\"VLK\"},\"image\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/person\\\/ca4fa8ce56fe338504218e3125d57293\",\"name\":\"Navya\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b24a0474903bb2ee9a4ef0bbd8ba4a24ce11bb0d859e3049b9e0142bd67f1f59?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b24a0474903bb2ee9a4ef0bbd8ba4a24ce11bb0d859e3049b9e0142bd67f1f59?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b24a0474903bb2ee9a4ef0bbd8ba4a24ce11bb0d859e3049b9e0142bd67f1f59?s=96&d=mm&r=g\",\"caption\":\"Navya\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"VLK Tops Out Denton ISD High School in Cross Roads","description":"Celebrating a milestone: VLK Architects and Denton ISD top out the new high school in Cross Roads, advancing education and community growth.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/","og_locale":"en_US","og_type":"article","og_title":"VLK Tops Out Denton ISD High School in Cross Roads","og_description":"Celebrating a milestone: VLK Architects and Denton ISD top out the new high school in Cross Roads, advancing education and community growth.","og_url":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/","og_site_name":"VLK","article_published_time":"2025-12-19T17:28:28+00:00","article_modified_time":"2026-01-13T15:24:46+00:00","og_image":[{"width":1024,"height":505,"url":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9686-e1766164506161-1024x505.jpg","type":"image\/jpeg"}],"author":"Navya","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Navya","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/#article","isPartOf":{"@id":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/"},"author":{"name":"Navya","@id":"https:\/\/vlkarchitects.com\/#\/schema\/person\/ca4fa8ce56fe338504218e3125d57293"},"headline":"VLK Joins Denton ISD in Topping Out Fifth High School in Cross Roads","datePublished":"2025-12-19T17:28:28+00:00","dateModified":"2026-01-13T15:24:46+00:00","mainEntityOfPage":{"@id":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/"},"wordCount":326,"publisher":{"@id":"https:\/\/vlkarchitects.com\/#organization"},"image":{"@id":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/#primaryimage"},"thumbnailUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9686-e1766164506161.jpg","keywords":["High School","K-12"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/","url":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/","name":"VLK Tops Out Denton ISD High School in Cross Roads","isPartOf":{"@id":"https:\/\/vlkarchitects.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/#primaryimage"},"image":{"@id":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/#primaryimage"},"thumbnailUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9686-e1766164506161.jpg","datePublished":"2025-12-19T17:28:28+00:00","dateModified":"2026-01-13T15:24:46+00:00","description":"Celebrating a milestone: VLK Architects and Denton ISD top out the new high school in Cross Roads, advancing education and community growth.","breadcrumb":{"@id":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/#primaryimage","url":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9686-e1766164506161.jpg","contentUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2025\/12\/Denton-HS-5-Topping-9686-e1766164506161.jpg","width":8256,"height":4073},{"@type":"BreadcrumbList","@id":"https:\/\/vlkarchitects.com\/vlk-joins-denton-isd-in-topping-out-fifth-high-school-in-cross-roads\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/vlkarchitects.com\/"},{"@type":"ListItem","position":2,"name":"VLK Joins Denton ISD in Topping Out Fifth High School in Cross Roads"}]},{"@type":"WebSite","@id":"https:\/\/vlkarchitects.com\/#website","url":"https:\/\/vlkarchitects.com\/","name":"VLK","description":"","publisher":{"@id":"https:\/\/vlkarchitects.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/vlkarchitects.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/vlkarchitects.com\/#organization","name":"VLK","url":"https:\/\/vlkarchitects.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vlkarchitects.com\/#\/schema\/logo\/image\/","url":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/10\/VLK-Logo.png","contentUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/10\/VLK-Logo.png","width":439,"height":635,"caption":"VLK"},"image":{"@id":"https:\/\/vlkarchitects.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/vlkarchitects.com\/#\/schema\/person\/ca4fa8ce56fe338504218e3125d57293","name":"Navya","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b24a0474903bb2ee9a4ef0bbd8ba4a24ce11bb0d859e3049b9e0142bd67f1f59?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b24a0474903bb2ee9a4ef0bbd8ba4a24ce11bb0d859e3049b9e0142bd67f1f59?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b24a0474903bb2ee9a4ef0bbd8ba4a24ce11bb0d859e3049b9e0142bd67f1f59?s=96&d=mm&r=g","caption":"Navya"}}]}},"_links":{"self":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/posts\/1771","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/comments?post=1771"}],"version-history":[{"count":0,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/posts\/1771\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/media\/1772"}],"wp:attachment":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/media?parent=1771"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/categories?post=1771"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/tags?post=1771"},{"taxonomy":"branded-service-type","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/branded-service-type?post=1771"},{"taxonomy":"construction-type","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/construction-type?post=1771"},{"taxonomy":"event-type","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/event-type?post=1771"},{"taxonomy":"office","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/office?post=1771"},{"taxonomy":"practice-area","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/practice-area?post=1771"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}