{"id":1153,"date":"2024-12-09T09:14:35","date_gmt":"2024-12-09T15:14:35","guid":{"rendered":"https:\/\/vlkarchitects.com\/?p=1153"},"modified":"2026-02-24T08:30:50","modified_gmt":"2026-02-24T14:30:50","slug":"vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school","status":"publish","type":"post","link":"https:\/\/vlkarchitects.com\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/","title":{"rendered":"VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On Wednesday, December 4, VLK Architects gathered with <a href=\"https:\/\/www.pbtisd.net\/\">Pecos-Barstow-Toyah ISD<\/a> students, administrators, and community members to celebrate the ribbon cutting of the new Career and Technical Education (CTE) and Science Wing at Pecos High School.<\/p>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p>Today, we celebrate a vision of the future for our students and our community. This CTE facility is a testament to what is possible when a community comes together with a shared belief in the power of education.<\/p><cite>Brent Jaco | Superintendent, Pecos-Barstow-Toyah ISD<\/cite><\/blockquote><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The two-story CTE and Science Wing opened for student use at the start of the 2024-2025 school year. The building was added to the existing Pecos High School campus and offers a variety of special program spaces for students to gain technical experience in 14 different pathways. The building is also home to the district\u2019s esports competition team and features a multimedia lab with large gaming displays. PBTISD partnered with Reeves County Hospital to design a health science lab that simulates the hospital&#8217;s facilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The building is designed to maximize efficiency and promote student safety and well-being, with ample natural daylight in innovative, collaborative learning spaces. A secure entry at the front allows community members to engage in some student programs, including cosmetology, veterinary, and culinary. A private access alleyway allows selective entry to access auto, welding, construction, and robotics workshop spaces. The building\u2019s insulated window treatments feature sun control blades to reduce heat from the West Texas sun from entering the building. Polished concrete flooring in the corridors and homogeneous resilient sheet flooring in labs are easy to clean and highly durable, reducing overall maintenance costs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cVLK is honored to have partnered with PBTISD and their community to bring their vision for career and technical education to fruition,\u201d said <a href=\"https:\/\/vlkarchitects.com\/leadership\/\">Monika Castillo, Principal at VLK Architects<\/a>. \u201cThe project provides the first glimpse for all other phases of their replacement campus, providing state-of-the-art programs to ensure their students are future ready.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The new CTE and Science Wing is Phase One of the Pecos High School Masterplan. Voters approved the CTE and Science Wing funding in the 2021 bond election. Phase Two of the Masterplan includes a new field house and Phase Three includes a three-story academic wing, athletic wing, and a new natatorium. Both phases are currently under construction and additional phases are in design.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"1157\" src=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3878-1024x682.jpg\" alt=\"\" class=\"wp-image-1157\" srcset=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3878-1024x682.jpg 1024w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3878-300x200.jpg 300w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3878-768x512.jpg 768w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3878-1536x1024.jpg 1536w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3878-1620x1080.jpg 1620w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3878.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"1159\" src=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3897-1024x682.jpg\" alt=\"\" class=\"wp-image-1159\" srcset=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3897-1024x682.jpg 1024w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3897-300x200.jpg 300w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3897-768x512.jpg 768w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3897-1536x1024.jpg 1536w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3897-1620x1080.jpg 1620w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3897.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"1160\" src=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3854-1024x682.jpg\" alt=\"\" class=\"wp-image-1160\" srcset=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3854-1024x682.jpg 1024w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3854-300x200.jpg 300w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3854-768x512.jpg 768w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3854-1536x1024.jpg 1536w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3854-1620x1080.jpg 1620w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3854.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"1158\" src=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3640-1024x682.jpg\" alt=\"\" class=\"wp-image-1158\" srcset=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3640-1024x682.jpg 1024w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3640-300x200.jpg 300w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3640-768x512.jpg 768w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3640-1536x1024.jpg 1536w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3640-1620x1080.jpg 1620w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3640.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"1156\" src=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3937-1024x682.jpg\" alt=\"\" class=\"wp-image-1156\" srcset=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3937-1024x682.jpg 1024w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3937-300x200.jpg 300w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3937-768x512.jpg 768w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3937-1536x1024.jpg 1536w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3937-1620x1080.jpg 1620w, https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/CTE-3937.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>About VLK: <\/strong>VLK provides architecture, planning, and interior design services to K-12, higher education, corporate, and institutional clients. For more information, please visit our website: www.vlkarchitects.com or contact 817-344-0344 or <a href=\"mailto:marketing@vlkarchitects.com\">marketing@vlkarchitects.com<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>About Pecos-Barstow-Toyah ISD:<\/strong> What began in 1883 as a small schoolhouse located along the Pecos River, Pecos-Barstow-Toyah Independent School District is now a fully operating district for pre-K-12 education. Located in West Texas between the Permian Basin and the mountainous terrain of El Paso, PBTISD is the premier provider of education for over 2,600 students with five campuses.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On Wednesday, December 4, VLK Architects gathered with Pecos-Barstow-Toyah ISD students, administrators, and community members to celebrate the ribbon cutting of the new Career and Technical Education (CTE) and Science Wing at Pecos High School. Today, we celebrate a vision of the future for our students and our community. This CTE facility is a testament [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1154,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[21],"tags":[55,53,54],"branded-service-type":[47,51],"construction-type":[],"event-type":[],"office":[],"practice-area":[33],"class_list":["post-1153","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-presentations","tag-vlk-edge","tag-vlk-scholarly-research","branded-service-type-vlk-edge","branded-service-type-vlk-scholarly-research","practice-area-education"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School - VLK<\/title>\n<meta name=\"description\" content=\"Explore Pecos High School&#039;s new CTE and Science Wing by VLK Architects, offering advanced labs, esports, and 14 technical pathways.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School - VLK\" \/>\n<meta property=\"og:description\" content=\"Explore Pecos High School&#039;s new CTE and Science Wing by VLK Architects, offering advanced labs, esports, and 14 technical pathways.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/\" \/>\n<meta property=\"og:site_name\" content=\"VLK\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-09T15:14:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-24T14:30:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Ribbon-Cutting-1024x682.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"682\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Brooke Stein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Brooke Stein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/2024\\\/12\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/\"},\"author\":{\"name\":\"Brooke Stein\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/person\\\/c22a50b50e2ad1aae41189511caa67d2\"},\"headline\":\"VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School\",\"datePublished\":\"2024-12-09T15:14:35+00:00\",\"dateModified\":\"2026-02-24T14:30:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/\"},\"wordCount\":490,\"publisher\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/2024\\\/12\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Ribbon-Cutting.jpg\",\"keywords\":[\"Presentations\",\"VLK | EDGE\",\"VLK Scholarly Research\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/2024\\\/12\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/\",\"name\":\"VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School - VLK\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/2024\\\/12\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/2024\\\/12\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Ribbon-Cutting.jpg\",\"datePublished\":\"2024-12-09T15:14:35+00:00\",\"dateModified\":\"2026-02-24T14:30:50+00:00\",\"description\":\"Explore Pecos High School's new CTE and Science Wing by VLK Architects, offering advanced labs, esports, and 14 technical pathways.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/2024\\\/12\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/vlkarchitects.com\\\/2024\\\/12\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/2024\\\/12\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/#primaryimage\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Ribbon-Cutting.jpg\",\"contentUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Ribbon-Cutting.jpg\",\"width\":2000,\"height\":1333},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/2024\\\/12\\\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/vlkarchitects.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#website\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/\",\"name\":\"VLK\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/vlkarchitects.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#organization\",\"name\":\"VLK\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/VLK-Logo.png\",\"contentUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/VLK-Logo.png\",\"width\":439,\"height\":635,\"caption\":\"VLK\"},\"image\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/person\\\/c22a50b50e2ad1aae41189511caa67d2\",\"name\":\"Brooke Stein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g\",\"caption\":\"Brooke Stein\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School - VLK","description":"Explore Pecos High School's new CTE and Science Wing by VLK Architects, offering advanced labs, esports, and 14 technical pathways.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/","og_locale":"en_US","og_type":"article","og_title":"VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School - VLK","og_description":"Explore Pecos High School's new CTE and Science Wing by VLK Architects, offering advanced labs, esports, and 14 technical pathways.","og_url":"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/","og_site_name":"VLK","article_published_time":"2024-12-09T15:14:35+00:00","article_modified_time":"2026-02-24T14:30:50+00:00","og_image":[{"width":1024,"height":682,"url":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Ribbon-Cutting-1024x682.jpg","type":"image\/jpeg"}],"author":"Brooke Stein","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Brooke Stein","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/#article","isPartOf":{"@id":"https:\/\/vlkarchitects.com\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/"},"author":{"name":"Brooke Stein","@id":"https:\/\/vlkarchitects.com\/#\/schema\/person\/c22a50b50e2ad1aae41189511caa67d2"},"headline":"VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School","datePublished":"2024-12-09T15:14:35+00:00","dateModified":"2026-02-24T14:30:50+00:00","mainEntityOfPage":{"@id":"https:\/\/vlkarchitects.com\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/"},"wordCount":490,"publisher":{"@id":"https:\/\/vlkarchitects.com\/#organization"},"image":{"@id":"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/#primaryimage"},"thumbnailUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Ribbon-Cutting.jpg","keywords":["Presentations","VLK | EDGE","VLK Scholarly Research"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/vlkarchitects.com\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/","url":"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/","name":"VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School - VLK","isPartOf":{"@id":"https:\/\/vlkarchitects.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/#primaryimage"},"image":{"@id":"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/#primaryimage"},"thumbnailUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Ribbon-Cutting.jpg","datePublished":"2024-12-09T15:14:35+00:00","dateModified":"2026-02-24T14:30:50+00:00","description":"Explore Pecos High School's new CTE and Science Wing by VLK Architects, offering advanced labs, esports, and 14 technical pathways.","breadcrumb":{"@id":"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/#primaryimage","url":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Ribbon-Cutting.jpg","contentUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Ribbon-Cutting.jpg","width":2000,"height":1333},{"@type":"BreadcrumbList","@id":"https:\/\/vlkarchitects.com\/2024\/12\/vlk-joins-pbtisd-for-ribbon-cutting-of-new-cte-and-science-wing-at-pecos-high-school\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/vlkarchitects.com\/"},{"@type":"ListItem","position":2,"name":"VLK joins PBTISD for Ribbon Cutting of New CTE and Science Wing at Pecos High School"}]},{"@type":"WebSite","@id":"https:\/\/vlkarchitects.com\/#website","url":"https:\/\/vlkarchitects.com\/","name":"VLK","description":"","publisher":{"@id":"https:\/\/vlkarchitects.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/vlkarchitects.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/vlkarchitects.com\/#organization","name":"VLK","url":"https:\/\/vlkarchitects.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vlkarchitects.com\/#\/schema\/logo\/image\/","url":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/10\/VLK-Logo.png","contentUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/10\/VLK-Logo.png","width":439,"height":635,"caption":"VLK"},"image":{"@id":"https:\/\/vlkarchitects.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/vlkarchitects.com\/#\/schema\/person\/c22a50b50e2ad1aae41189511caa67d2","name":"Brooke Stein","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g","caption":"Brooke Stein"}}]}},"_links":{"self":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/posts\/1153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/comments?post=1153"}],"version-history":[{"count":0,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/posts\/1153\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/media\/1154"}],"wp:attachment":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/media?parent=1153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/categories?post=1153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/tags?post=1153"},{"taxonomy":"branded-service-type","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/branded-service-type?post=1153"},{"taxonomy":"construction-type","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/construction-type?post=1153"},{"taxonomy":"event-type","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/event-type?post=1153"},{"taxonomy":"office","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/office?post=1153"},{"taxonomy":"practice-area","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/practice-area?post=1153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}