{"id":1151,"date":"2024-12-06T12:53:57","date_gmt":"2024-12-06T18:53:57","guid":{"rendered":"https:\/\/vlkarchitects.com\/?p=1151"},"modified":"2026-06-16T13:12:21","modified_gmt":"2026-06-16T18:12:21","slug":"construction-begins-on-waxahachie-isds-second-high-school","status":"publish","type":"post","link":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/","title":{"rendered":"Construction Begins on Waxahachie ISD\u2019s Second High School"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On Tuesday, December 3, 2024, VLK joined Waxahachie ISD students and administration, community members, and Pogue Construction to break ground on the district\u2019s second comprehensive high school, to be named Waxahachie Creek High School. Located near Lake Waxahachie and Highway 77, this 520,000 sf campus will serve up to 3,200 students, providing essential space for the district\u2019s rapidly growing student population and securing the foundation for generations of learning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Designed as an innovative yet timeless facility, the campus will feature specialized learning environments tailored to support collaboration, problem solving, and career readiness. The campus will incorporate glazed openings for natural light, a flexible and technology-rich classroom design, and a centrally located library that will serve as a vibrant hub for students. Purposefully designed spaces will include a dedicated Career and Technology Education (CTE) wing with advanced labs for automotive, cosmetology, forensics, health science, veterinary medicine, and engineering, fostering innovation and hands-on learning. In addition to these academic spaces, the school will offer robust athletics and fine arts programs with state-of-the-art facilities, including an 800-seat auditorium, an indoor practice facility, two auxiliary gymnasiums, and a full athletic complex with baseball, softball, track and field, soccer, and football fields. These facilities, paired with modern dining areas and landscaped courtyards, create an environment that inspires student engagement and supports Waxahachie ISD\u2019s commitment to preparing students for future success.<\/p>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p>\u201cThis milestone represents more than the start of construction, but the progress of a community united in its vision for the future. I look forward to seeing how this new campus will empower and provide more opportunities for students in Waxahachie ISD.\u201d<\/p><cite>Jonathan Aldis | VLK Chief Operations Officer<\/cite><\/blockquote><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The funding for the district\u2019s second high school was included in the voter-approved May 2023 bond. With the groundbreaking marking the start of construction, Waxahachie ISD plans to welcome students and staff to the new campus at the beginning of the 2027-2028 school year.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-default\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>About VLK: <\/strong>VLK provides architecture, planning, and interior design services to automotive, K-12, higher education, corporate, and institutional clients, delivering innovative solutions for their specific needs. For more information, please contact <a href=\"mailto:marketing@vlkarchitects.com\">marketing@vlkarchitects.com<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>About Waxahachie ISD:<\/strong> Waxahachie ISD was founded in 1884 and has a rich tradition of excellence in education. The district encompasses 192 square miles in the heart of Ellis County. Waxahachie ISD is a fast-growth district with a diverse student population of more than 11,000 and more than 1,700 employees committed to the success of every student. While Waxahachie ISD is steeped in tradition, it is also a district where innovation thrives and growth is limitless. Our core values of choice, collaboration, belonging, and community are foremost in everything we do.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On Tuesday, December 3, 2024, VLK joined Waxahachie ISD students and administration, community members, and Pogue Construction to break ground on the district\u2019s second comprehensive high school, to be named Waxahachie Creek High School. Located near Lake Waxahachie and Highway 77, this 520,000 sf campus will serve up to 3,200 students, providing essential space for [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1152,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[21],"tags":[55,53,54],"branded-service-type":[47,51],"construction-type":[],"event-type":[],"office":[],"practice-area":[33],"class_list":["post-1151","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-presentations","tag-vlk-edge","tag-vlk-scholarly-research","branded-service-type-vlk-edge","branded-service-type-vlk-scholarly-research","practice-area-education"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Begins on Waxahachie ISD\u2019s Second High School - VLK<\/title>\n<meta name=\"description\" content=\"VLK breaks ground on Waxahachie ISD\u2019s second high school, designed for 3,200 students with advanced CTE labs, athletics, and fine arts spaces.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Begins on Waxahachie ISD\u2019s Second High School - VLK\" \/>\n<meta property=\"og:description\" content=\"VLK breaks ground on Waxahachie ISD\u2019s second high school, designed for 3,200 students with advanced CTE labs, athletics, and fine arts spaces.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/\" \/>\n<meta property=\"og:site_name\" content=\"VLK\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-06T18:53:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-16T18:12:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Waxahachie-Creek-FRONT-ENTRY-1024x576.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Brooke Stein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Brooke Stein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/\"},\"author\":{\"name\":\"Brooke Stein\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/person\\\/c22a50b50e2ad1aae41189511caa67d2\"},\"headline\":\"Construction Begins on Waxahachie ISD\u2019s Second High School\",\"datePublished\":\"2024-12-06T18:53:57+00:00\",\"dateModified\":\"2026-06-16T18:12:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/\"},\"wordCount\":445,\"publisher\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Waxahachie-Creek-FRONT-ENTRY.jpg\",\"keywords\":[\"Presentations\",\"VLK | EDGE\",\"VLK Scholarly Research\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/\",\"name\":\"Construction Begins on Waxahachie ISD\u2019s Second High School - VLK\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Waxahachie-Creek-FRONT-ENTRY.jpg\",\"datePublished\":\"2024-12-06T18:53:57+00:00\",\"dateModified\":\"2026-06-16T18:12:21+00:00\",\"description\":\"VLK breaks ground on Waxahachie ISD\u2019s second high school, designed for 3,200 students with advanced CTE labs, athletics, and fine arts spaces.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/#primaryimage\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Waxahachie-Creek-FRONT-ENTRY.jpg\",\"contentUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Waxahachie-Creek-FRONT-ENTRY.jpg\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/construction-begins-on-waxahachie-isds-second-high-school\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/vlkarchitects.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Begins on Waxahachie ISD\u2019s Second High School\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#website\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/\",\"name\":\"VLK\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/vlkarchitects.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#organization\",\"name\":\"VLK\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/VLK-Logo.png\",\"contentUrl\":\"https:\\\/\\\/vlkarchitects.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/VLK-Logo.png\",\"width\":439,\"height\":635,\"caption\":\"VLK\"},\"image\":{\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/vlkarchitects.com\\\/#\\\/schema\\\/person\\\/c22a50b50e2ad1aae41189511caa67d2\",\"name\":\"Brooke Stein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g\",\"caption\":\"Brooke Stein\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Begins on Waxahachie ISD\u2019s Second High School - VLK","description":"VLK breaks ground on Waxahachie ISD\u2019s second high school, designed for 3,200 students with advanced CTE labs, athletics, and fine arts spaces.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/","og_locale":"en_US","og_type":"article","og_title":"Construction Begins on Waxahachie ISD\u2019s Second High School - VLK","og_description":"VLK breaks ground on Waxahachie ISD\u2019s second high school, designed for 3,200 students with advanced CTE labs, athletics, and fine arts spaces.","og_url":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/","og_site_name":"VLK","article_published_time":"2024-12-06T18:53:57+00:00","article_modified_time":"2026-06-16T18:12:21+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Waxahachie-Creek-FRONT-ENTRY-1024x576.jpg","type":"image\/jpeg"}],"author":"Brooke Stein","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Brooke Stein","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/#article","isPartOf":{"@id":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/"},"author":{"name":"Brooke Stein","@id":"https:\/\/vlkarchitects.com\/#\/schema\/person\/c22a50b50e2ad1aae41189511caa67d2"},"headline":"Construction Begins on Waxahachie ISD\u2019s Second High School","datePublished":"2024-12-06T18:53:57+00:00","dateModified":"2026-06-16T18:12:21+00:00","mainEntityOfPage":{"@id":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/"},"wordCount":445,"publisher":{"@id":"https:\/\/vlkarchitects.com\/#organization"},"image":{"@id":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/#primaryimage"},"thumbnailUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Waxahachie-Creek-FRONT-ENTRY.jpg","keywords":["Presentations","VLK | EDGE","VLK Scholarly Research"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/","url":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/","name":"Construction Begins on Waxahachie ISD\u2019s Second High School - VLK","isPartOf":{"@id":"https:\/\/vlkarchitects.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/#primaryimage"},"image":{"@id":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/#primaryimage"},"thumbnailUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Waxahachie-Creek-FRONT-ENTRY.jpg","datePublished":"2024-12-06T18:53:57+00:00","dateModified":"2026-06-16T18:12:21+00:00","description":"VLK breaks ground on Waxahachie ISD\u2019s second high school, designed for 3,200 students with advanced CTE labs, athletics, and fine arts spaces.","breadcrumb":{"@id":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/#primaryimage","url":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Waxahachie-Creek-FRONT-ENTRY.jpg","contentUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/12\/Waxahachie-Creek-FRONT-ENTRY.jpg","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/vlkarchitects.com\/construction-begins-on-waxahachie-isds-second-high-school\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/vlkarchitects.com\/"},{"@type":"ListItem","position":2,"name":"Construction Begins on Waxahachie ISD\u2019s Second High School"}]},{"@type":"WebSite","@id":"https:\/\/vlkarchitects.com\/#website","url":"https:\/\/vlkarchitects.com\/","name":"VLK","description":"","publisher":{"@id":"https:\/\/vlkarchitects.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/vlkarchitects.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/vlkarchitects.com\/#organization","name":"VLK","url":"https:\/\/vlkarchitects.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vlkarchitects.com\/#\/schema\/logo\/image\/","url":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/10\/VLK-Logo.png","contentUrl":"https:\/\/vlkarchitects.com\/wp-content\/uploads\/2024\/10\/VLK-Logo.png","width":439,"height":635,"caption":"VLK"},"image":{"@id":"https:\/\/vlkarchitects.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/vlkarchitects.com\/#\/schema\/person\/c22a50b50e2ad1aae41189511caa67d2","name":"Brooke Stein","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a64a164278ff70f9bc2b684b7749b54eecb1a8ea434b4306ad4de305e76160bb?s=96&d=mm&r=g","caption":"Brooke Stein"}}]}},"_links":{"self":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/posts\/1151","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/comments?post=1151"}],"version-history":[{"count":0,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/posts\/1151\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/media\/1152"}],"wp:attachment":[{"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/media?parent=1151"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/categories?post=1151"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/tags?post=1151"},{"taxonomy":"branded-service-type","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/branded-service-type?post=1151"},{"taxonomy":"construction-type","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/construction-type?post=1151"},{"taxonomy":"event-type","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/event-type?post=1151"},{"taxonomy":"office","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/office?post=1151"},{"taxonomy":"practice-area","embeddable":true,"href":"https:\/\/vlkarchitects.com\/wp-json\/wp\/v2\/practice-area?post=1151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}